https://bspjimedan.kemenperin.go.id/ slot gacor slot gacor slot gacor hari ini slot gacor slot gacor slot gacor hari ini https://pbb-desatenaru.gresikkab.go.id/ https://jdih.padangpanjang.go.id/ https://acr.ffvelo.fr/ https://ecbc.ffvelo.fr/ slot demo slot gacor https://europall13-19.ffvelo.fr/ slot qris
berita hari ini produk kecantikan Belajar di Rumah Jadi Lebih Produktif Tips & Saran Ampuh Agar Nggak Cepat Bosan Peluang Bisnis UMKM Terbaru 2025 rahasia wanita mastering slot machine poker online manfaat obat kuat slot games https://ffnagajp1131.org/
SLOT GACOR # Link Login Situs Game Online Resmi & Gampang Maxwin Hari Ini BOS01 : Agen Slot Gacor Maxwin Hari Ini Provider Hits Slot88 Dan Slot777 Online 2025 BOS911 : Situs Slot Gacor Terbaru & Link Login Slot88 Resmi 2025 Bos01 Bos01 Bos911 Bos911 Bos01 Bos01 Bos01 Bos01 Bos01 Bos01 Bos01 Bos01 Bos01 Bos01 Bos911 Bos01 Bos01 Bos01 Lumbung4d Bos01 Bos01 Lumbung4d Bos01
FAQ
Search

FAQ 1: How to get a copy of the building plan?

The applicant must submit a letter stating the required building name plan and the purpose of the application.


FAQ 2: How to make a modification and upgrade application?

The applicant must make an application in writing and state the need for the modification or upgrade to be done.


FAQ 3: Why do public damage complaints take so long to be repaired?

a. Once the complaint is received by JP, the complaint will be investigated within 24 working hours.

b. Complaints will be classified according to the type of damage and current condition.

c. The repair period is based on the above assessment.

d. The complaint will be given to the contractor for repair work.

e. Once the Purchase Order (PO) is obtained, only then will the repair work be done.


FAQ 4: How long will action be taken after a damage complaint is made?

Scope of Work /Duration Remedial action:

Mechanical -  Minor Damage 1 week, Major Damage < 1 month.

Electrical - Minor Damage 1 week, Major Damage < 1 month.

Public - Minor Damage 1 week, Major Damage < 1 month.

Cleaning - 1-7 days

Landscape - 1-7 days

Pest Control - 1-7 days